The Importance of Viewing Results at the Proper Time Scale in SWMM5 and InfoSWMM Models

Subject:   The Importance of Viewing Results at the Proper Time Scale
In SWMM 5 when you are simulating rapidly changing flow – such as pump flows – it is important to  remember that you are only seeing the results of the simulation at your selected report time step.  Here is an example model with the same number of pump starts for all three simulations (318), the same  average time step during the simulation (10 seconds) but different report time steps.  The conception of the pump starts is totally different visually depending on the selected report time steps.  You should always compare the starts using the pump graphs and the pump summary table.    The percent utilized and the number of pump start ups tells you  the mean pump start length or in this case 153 seconds or 45.1 percent of 30 hours divided by 318 pump starts.

No comments:

How to use the ICM Viewer with ICM Standard after installing from ICM Ultimate

  From version 2025 onwards, both Standard and Ultimate versions can be launched from a single installation by modifying the Target path in ...