Problem: As SWMM5 is a link node network, the area of a Storage Node is both the area of the Wet Well and typically ½ the surface area of the connecting links. There is no surface area for the Pump(s) downstream of the Wet Well (Storage) but the area of the upstream links will add to the surface area of the Wet Well. One Answer: You can eliminate this issue by adding a in a Dummy link to connect the upstream Gravity Main links to the Wet Well. The Dummy link has no surface area and sets the Outflow of the link to the Total Inflow of the Upstream Node to the Dummy link. The Wet Well will then only have the surface area of the Wet Well.
Autodesk Technologist with Information about Stormwater Management Model (SWMM) for watershed water quality, hydrology and hydraulics modelers (Note this blog is not associated with the EPA). You will find Blog Posts on the Subjects of SWMM5, ICM SWMM, ICM InfoWorks, InfoSWMM and InfoSewer.
Subscribe to:
Post Comments (Atom)
XPSWMM to ICM SWMM or ICM Process Pathways
# Process Description 1 Technical details about how XPSWMM models a feature This process involves understanding the specific algorithms, e...
-
@Innovyze User forum where you can ask questions about our Water and Wastewater Products http://t.co/dwgCOo3fSP pic.twitter.com/R0QKG2dv...
-
Engine Error Number Description ERROR 101: memory allocation error. ...
-
47th Annual International Conference Toronto, Canada February 26-27, 2014 Call for papers Have you implemented a good idea recen...
No comments:
Post a Comment