The Startup and Shutoff depths are evaluated 1st followed by any Control Rules. The priority value is just to decide between two or more control rules that are both active at the current time step. The rule with the highest priority will be used or in the case of two rules with the same priority the last control rule evaluated will be used during the current time step.
Autodesk Technologist with Information about Stormwater Management Model (SWMM) for watershed water quality, hydrology and hydraulics modelers (Note this blog is not associated with the EPA). You will find Blog Posts on the Subjects of SWMM5, ICM SWMM, ICM InfoWorks, InfoSWMM and InfoSewer.
Tuesday, December 21, 2010
Subscribe to:
Post Comments (Atom)
Blog strategy to explain complex modeling concepts to non-modelers, while highlighting the beauty and majesty of domain knowledge:
B log strategy to explain complex modeling concepts to non-modelers, while highlighting the beauty and majesty of domain knowledge: Title : ...
-
@Innovyze User forum where you can ask questions about our Water and Wastewater Products http://t.co/dwgCOo3fSP pic.twitter.com/R0QKG2dv...
-
Subject: Detention Basin Basics in SWMM 5 What are the basic elements of a detention pond in SWMM 5? They are common in our back...
-
Engine Error Number Description ERROR 101: memory allocation error. ...
No comments:
Post a Comment