Showing posts with label Meaning of a Node Continuity Error of 100 Percent in SWMM 5. Show all posts
Showing posts with label Meaning of a Node Continuity Error of 100 Percent in SWMM 5. Show all posts

Sunday, July 28, 2013

Meaning of a Node Continuity Error of 100 Percent in SWMM 5

Note:  A continuity error of 100 percent for some nodes in SWMM5 simply means that the total lateral flow and total inflow from the upstream links and the outflow to downstream links is zero.

  

The Goal of SWMM5 Input Files

 ðŸŒŸ SWMM5 (Storm Water Management Model 5) is a widely used urban hydrology and hydraulic modeling software developed by the United States E...