Showing posts with label How to Decide on a Time Step in InfoSWMM. Show all posts
Showing posts with label How to Decide on a Time Step in InfoSWMM. Show all posts

Wednesday, December 8, 2010

How to Decide on a Time Step in InfoSWMM

Note: How to Decide on a Time Step in InfoSWMM

Step 1: Your first guess was 300 seconds which had a very large continuity and unstable links. If you look at the your average time step a good time step would be 10 seconds based on your average time step of 2.6 seconds.


Step 2: Run your model with a time step of 10 seconds and check the flows and the continuity error. In this case by using a maximum time step near the average time step you got rid of the continuity error and the unstable link flows.


GitHub code and Markdown (MD) files Leveraging

 To better achieve your goal of leveraging your GitHub code and Markdown (MD) files for your WordPress blog or LinkedIn articles, consider t...