Showing posts with label When is Warning 02 Used in the SWMM 5 Engine?. Show all posts
Showing posts with label When is Warning 02 Used in the SWMM 5 Engine?. Show all posts

Friday, February 27, 2015

When is Warning 02 Used in the SWMM 5 Engine?

When is Warning 02 Used in the SWMM 5 Engine?

1. If the crown elevation of the highest connecting link is greater than the maximum depth of the node, then
2. The maximum depth of the node is increased to the crown elevation of highest connecting link
3. This is an  internal engine change and is reflected in the Output HGL
4. For example, a 4 foot pipe connected to a node with a maximum depth of 2 feet will be increased to 4 feet
5. The output text file will say what the maximum depth is or 4 feet in this case
SNAGHTML2b765860
The Meaning of Warning 02

The Goal of SWMM5 Input Files

 ðŸŒŸ SWMM5 (Storm Water Management Model 5) is a widely used urban hydrology and hydraulic modeling software developed by the United States E...