Showing posts with label Time Step Approximation based on Link Lengths. Show all posts
Showing posts with label Time Step Approximation based on Link Lengths. Show all posts

Saturday, September 3, 2011

Time Step Approximation based on Link Lengths

Note:  A rough approximation of the time step you need for an InfoSWMM or H2OMAP SWMM model can be found by finding the mean link length using the field statistics tool for the length in the Conduit DB Table and then estimating the time step from the mean length, mean full depth velocity and mean full depth wave celerity.

The time step actually used during the simulation is related to this velocity and the safety adjustment factor.  The larger the safety adjustment factor the larger the mean time step listed in the Routing Time Step Suggestion.




The Goal of SWMM5 Input Files

 ðŸŒŸ SWMM5 (Storm Water Management Model 5) is a widely used urban hydrology and hydraulic modeling software developed by the United States E...