Showing posts with label Link Depth and Node Depth Relationship in SWMM 5. Show all posts
Showing posts with label Link Depth and Node Depth Relationship in SWMM 5. Show all posts

Saturday, July 27, 2013

Link Depth and Node Depth Relationship in SWMM 5

Note:  The depth in a manhole or node in SWMM 5 can be higher than the depth in the connecting links if the link is surcharged.  Typically the upstream link depth is equal to the upstream node depth (if there is not link offsets) and the downstream link depth is equal to the downstream node depth (if there is no offsets) until the link is surcharged and then thenode surcharge depth algorithm is used in SWMM 5 and point iteration equation is used to calculate the surcharge depth in the node.

The Goal of SWMM5 Input Files

 ðŸŒŸ SWMM5 (Storm Water Management Model 5) is a widely used urban hydrology and hydraulic modeling software developed by the United States E...