Wednesday, December 8, 2010

How to Decide on a Time Step in InfoSWMM

Note: How to Decide on a Time Step in InfoSWMM

Step 1: Your first guess was 300 seconds which had a very large continuity and unstable links. If you look at the your average time step a good time step would be 10 seconds based on your average time step of 2.6 seconds.


Step 2: Run your model with a time step of 10 seconds and check the flows and the continuity error. In this case by using a maximum time step near the average time step you got rid of the continuity error and the unstable link flows.


No comments:

InfoSWMM Version Numbers and the version of Arc Map they use and which EPA SWMM5 Engine is used for Each InfoSWMM Version

 InfoSWMM Version Numbers  InfoSWMM Version 14.7  Update 3 for Arc Map 10 to 10.8 and Windows 7/8/8.1/10 - EPA SWMM 5.1.014   4/12/2020   ...