H2OMAP-Sewer - FM Split Issue

Note: One method would be to add a duplicate Wet Well/Pump/Force Main set of links to pass the flow from the upstream Force Main to the two downstream Force Mains (FM). The pump should be fixed capacity to handle all of the split GM flows. In this particular example the flows are split 50/50 to links 25 and 35 after leaving the loading manhole 24.